| HIST-060-003 | Security Division S Room; 07/15/1947 |
| HIST-061-001 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Exterior and Interior EM Barrack; 10/10/42 and 11/24/42; 08/25/1947 |
| HIST-061-002 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Excavation for B Building (12/12/1942); Adverse Winter Weather Conditions - Bulldozer Clearing Mire off Road (1/1/1943); 08/25/1947 |
| HIST-061-003 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Crane Lifting Laboratory Section Dryer up through Window in Wing 8 (11/26/1942); Diesel Motor with Attached Generator for Emergency Power (11/26/1942); 08/25/1947 |
| HIST-061-004 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Excavation of Central Portion of A Building - Looking South (9/5/1942); Construction of EM Barracks (9/12/1942); 08/25/1947 |
| HIST-061-005 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Rapid Progress Construction - B Building Only 26 Days after Ground Was Broken; South Side of B Building - 40 Days after Ground Was Broken; 08/25/1947 |
| HIST-061-006 | Construction of A.S.A.-E.M. Bks. "A" Bldg. Copies; Interior of Second Floor, Wing 8, "A" Building (11/6/1942); IBM Unit of B Section Being Moved (11/26/1942); 8/25/1947 |
| HIST-061-007 | Construction of A.S.A.-E.M. Bks. A Bldg. Copies; Field Kitchen (10/10/1942); Chow Line Inside Mess Hall (10/10/1942); 08/25/1947 |
| HIST-062-001 | Installations in Japan for Barker; 09/02/1947 |
| HIST-062-002 | Installations in Japan for Barker; 09/02/1947 |
| HIST-062-003 | Installations in Japan for Barker; Kyoto 12614 Camp Stafford; 09/02/1947 |
| HIST-062-004 | Installations in Japan for Barker; 09/02/1947 |
| HIST-062-005 | Installations in Japan for Barker; 09/02/1947 |
| HIST-062-006 | Installations in Japan for Barker; 09/02/1947 |
| HIST-062-007 | Installations in Japan for Barker; 09/02/1947 |